Choose the appropriate method and the installation and use of plastic towline

10-21
2017

Select the appropriate method of plastic towline:

1, the principle of selection of plastic towline cable selection: height: built-in pipe, gas pipe or water pipe. The most thick piece as the reference height. At least ten percent of the space height and the height as the towline. If the cables, tubing, trachea and water pipes need to overlap, the actual height after overlap should be used as the reference height.

In 2, a cable: wide choice of coarse; oil pipe, gas pipe or water pipe and its outer diameter as the inner width of the reference and stay at least ten percent to the width of the space.

3, bending radius: select the built-in cable; oil pipe, trachea, water pipe bending radius as the test value, and leave more than ten percent of the space.

4, how to place: the plastic towline cable, tubing, pipe, pipe; should have ten percent to fifteen percent of the remaining space so that the built-in cable, tubing, the trachea can move freely; when the bending radius in strong pulling force on the chain can not protect the cable, tubing or pipe.

5. The wire with large diameter difference should be laid separately, the weight distribution is average, and if necessary, it can be separated by the isolation strip.

6, plastic towline to run high speed or high frequency to minimize the wires are separated from each other in level, refused to overlap more time, wire and cable, tubing, pipe recommendations placed separately using the spacer.

The installation and use of plastic towline:

A: how to place in plastic towline cable, tubing, pipe, pipe; machine facilities, inside there should be ten percent to fifteen percent of the activity space for the built-in cable, tubing, the trachea can move freely; when the bending radius in strong friction force on the chain will not guarantee, and can fully protect the cable pipe or the trachea.

Two. The wire with large diameter difference should be laid on the average and the weight distribution is balanced. If necessary, it can be separated by the isolation strip.

Three, plastic towline to run high speed or high frequency to try to guide each other in separate level, so as to avoid overlapping, when more wires, cables, oil pipes and gas pipes etc. suggestions placed separately using the spacer.

In four, a cable: wide choice of coarse; oil pipe, gas pipe or water pipe and its outer diameter as the inner width of the reference and stay at least ten percent to the width of the space.

Five, bending radius: select the built-in cable; oil pipe, trachea, water pipe bending radius as the test value, and leave more than ten percent enough space.

The selection of standard six, plastic towline: diameter height: should choose the built-in cable, tubing, pipe, pipe of the most coarse as a reference height. At least ten percent of the space height and the height of the inner cavity of the towline as. If the cables, tubing, trachea and water pipes need to overlap, the actual height of the inner cavity as the reference height should be used as the reference height.

Product